Builders John and andy are just arriving at the new worksite, with site foreman already waiting for them

Site foreman points out to John and Andy where the gap in the railings needs to be, so access can be gained to the site

John and Andy carefully unload the mini digger, whilst Site foreman studies the job notes

Andy slamms the bucket down the join of the railings, shattering the joining bolts

The mangled railling sections are dragged aside to create a clear access route, Site foreman radios in for the first delivery.

Andy brings the truck round to set of down to the site, but Site foreman isn't keen on riding in the back
