Site foreman moves his truck, so that the crane can set up in it's place. John carefull ysees them back
The crane crew are set up just in time for the arrival of the first delivery - a container which contains equipment and materials, and can be used for secure storage
John sees the truck back into a suitable position of unloading. A yard area is to be created up here, at the top of the hill.
With the wheels of the trailer chokked, the crane crew can secure the load
The heavy metal hooks often need a little pursuasion with a hammer to make them locate
With the load secure, the container is lifted high into the air, and is bought down to where it is to be placed. John, Andy, and a member of the crane crew help to manouver the container down into the right position
The container is unloaded safely, and just in time, as a second one arrives