Overground and the P&M site office:
A mini tractor pulls a machine along the length of the site which levels and grades the soil:
Because there is no vehicular access available to the worksite, machines have to be lowered down by crane and a road roller is far too heavy, so a wacker plate is used. It compacts the earth down ready for the track to be laid: