Just down from the crane is a digger clearing away any loose material that has settled on the ground, ready to recieve the track:
There are skips placed all along the work site which have to be emptied regularly:
My avatar gets a ride with the P&M site manager in his pick up:
The 3 Blocks site office is situated half way along the site:
Just outside, workers are unloading sand down to the work site from the access road for use in the track laying: